These requirements are for new building construction seeking gas sign off and gas authorization. Not all items apply to every building, for example, not every new building will contain a standpipe and/or sprinkler system.
- Tap Letter
- Water Meter Permit
- Sprinkler Hydro Test (for floor or floors housing boiler(s) including floor above and below)
- Standpipe Passed (for floor or floors housing boiler(s) including floor above and below)
- Boiler Inspection Passed
FOR EXISTING CONSTRUCTION: